Mastic Road Bridge Replacement in Fairview Park

  • Notice to Proceed: 10/14/2020
  • Start Date: 3/1/2020
  • Completion Date: 7/31/2021
  • Project Amount: $4,115,506.66
  • This Page Last Updated On: 11/16/2020

Contractor:                                                                     County Project Contacts:
Kokosing Construction Company, Inc.                            Joe Charif 440-701-1262

440 -891-1444                                                                   Bill Nugent 

Notice to Proceed:     March 2020                            Contract Award Amount: $3,991,132.48

Start Date:   March 2020                                          Approved Contract Increases:  $0  

Scheduled Completion Date:  July, 2021                 Approved Contract Decreases:  $0 

Anticipated Completion Date: July, 2021     Estimated Cost to Complete:  $3,620,427.30

PROGRESS:

November 16, 2020

  • Mastic Road between Eaton Road and Valley Parkway is closed.

    Work Completed:

  • Placed Phase II of QC2 concrete for the superstructure.
  • Installed new epoxy coated reinforcing steel for the inside barrier wall and the outside path parapet wall.
  • Place concrete for rear approach slab.
  • Grade and places new concrete base pavement.
  • Perform pavement planning of asphalt concrete.
  • Install new concrete curb type 6 and underdrain.
  • Install new concrete curb and gutter.

    Work to be Performed:

  • Removal of deck false work and formsInstall new epoxy coated reinforcing steel and place concrete for inside barrier wall.
  • Place intermediate and surface course asphalt for the roadway portion of the project
  • Perform bridge deck grooving and seal deck surface
  • Install guardrail, per plan.
  • Form and place concrete for cast-in-place wall on solider pile walls 1 & 2.

 

 October 14, 2020

  • Mastic Road between Eaton Road and Valley Parkway is closed. 
     
    Work Completed: • Install new epoxy coated reinforcing steel for the structure’s deck Phase I and Phase II. • Place QC2 concrete for superstructure, as per plan, Phase I. • Maintain water cure for deck. • Install new epoxy coated reinforcing steel for parapet wall.  • Form and install new epoxy coated reinforcing steel for the forward approach slab. • Place concrete and maintain water cure for the forward approach slab. • Excavate and form pressure relief joints for the rear and forward pavement areas. 
     
    • Work to be Performed:  • Place QC2 concrete for superstructure, as per plan, Phase II. • Maintain water cure for deck. 

 

Maintenance of Traffic:

  • Traffic is still controlled by construction barrels and cones, until permanent striping is placed.
  • Traffic is being maintained in both north and south directions.

September 10, 2020

  • Work is being done to perform casting replacement and adjustments between Union and Harvard Avenue in both directions.
  • Work is continuing for the construction of the roundabout at the Farrington and E. 116th Avenue intersection.
  • All sewer work and roadway base grading has been completed.
  • Work is currently being setup to complete roadway pavement.

Maintenance of Traffic:

  • Northbound traffic is closed at E. 116th and Corlett Avenue, detour is in effect.
  • Southbound traffic is partially reopened and is utilizing newly constructed roundabout at E. 116th Street and MLK.
  • One-way traffic is utilized in both directions.

August 5, 2020

  •  Most of the intersection re configurations at MLK and Corlett Avenue have been completed where each have been brought back to intermediate surface asphalt.
  • Work is being done to perform castings replacement and adjustments between MLK and Harvard Avenue in both directions.
  • Work is beginning to construct the other half of the proposed roundabout at E. 116th and MLK in the northbound lanes.

Maintenance of Traffic:

  • Northbound traffic is closed at E. 116th and Corlett Avenue, detour is in effect.
  • Southbound traffic is partially reopened and is utilizing newly constructed roundabout at E. 116th Street and MLK.
  • One-way traffic is utilized in both directions.

July 10, 2020

  • Roadway pavement has been removed at the intersection of MLK Avenue and E. 116th Street to reconfigure the intersection into a roundabout.
  • This will include removal of roadway, sub-base, walk, curb and drainage facilities.

Maintenance of Traffic:

  • Southbound traffic is closed at E. 116th Street and MLK Avenue; detour is in effect.
  • Northbound traffic tapers down to one lane at the intersection of E. 116th St., and MLK Ave.
  • This is all due to construction to reconfigure the E. 116th St., and MLK Ave. intersection.